关闭

Steam pipe

Condensate detection in the water-steam cycle

过程数据

测量任务:
Point level detection
测量点:
Closed pipe system
测量范围至:
Switching contact
介质:
Steam/condensate
过程温度:
+150 … +320 °C
过程压力:
+60 … +100 bar
特殊挑战:
High pressures and temperatures

应用范围

To warm up the water for the boiler, steam is bled from the power plant turbine and delivered into a preheater. As the steam cools and condenses, it is removed from the preheater with pumps. Any condensate gathering in steam pipes has to be reliably detected to prevent it from entering the turbine. Vibrating level switches, mounted at low points in the system, reliably detect any water accumulation.

建议的产品


存储应用

请您将应用存储成PDF文件。

PDF 下载